Skip to content
Established in 2008Cairo, Egypt
Flags of Arab countries
Arab Union for Human Resources Developmentالاتحاد العربي لتنمية الموارد البشريةVisitor Register
Union News
Programme information

Engineering

Thermal Energy Engineering and Performance Analysis of Generators and Turbine Engines

This English page provides programme information and an outline. Confirm the final approved content and participation arrangements with the Union before participation. Fee inclusions are listed below.

Past date — retained as an archive record. Confirm the delivery language and arrangements with the Union.

Information to help you decide

Published dates
2026-06-21 - 2026-06-25
Location
Cairo — Arab Union for Human Resources Development headquarters
Published fee
600 USD
Published duration
One week
Delivery language
Arabic — English delivery is available by agreement
Attendance mode
In person
Training hours
25 training hours

These dates have passed. This requests a new date, not a booking in the ended session. The Union confirms dates and availability.

What programme fees include

  • Training
  • Training materials
  • Certificate
  • Break between sessions
  • Lunch
  • Airport pickup and drop-off

The published fee is the total amount payable by the participant. No additional fees are charged.

Request an invoice or an official quotation — Include the programme name or reference in your request.

Certificate of completion

Participants receive a certificate of completion for the programme, workshop or training course, issued by the Arab Union for Human Resources Development.

English programme information is available below; confirm the delivery language with the Union. The published date has passed; this page remains a reference to the programme record.

Introduction

The programme “Thermal Energy Engineering and Performance Analysis of Generators and Turbine Engines” develops professional practice in Engineering. It connects the subject with workplace challenges by examining existing evidence and practices and choosing methods appropriate to the organization and its available resources.

The learning progresses from electrical systems, control, and operational efficiency to project planning and implementation control, with practical work on energy management, resource efficiency, and renewable alternatives, mechanical equipment analysis and fault diagnosis, engineering design, modeling, and simulation. Participants prepare outputs to support workplace application and review the quality and results of implementation.

Learning objectives

  1. Read a training electrical system and identify inspection, protection, and control requirements in an application related to “Thermal Energy Engineering and Performance Analysis of Generators and Turbine Engines”.
  2. Analyze energy consumption and improvement opportunities and evaluate alternatives.
  3. Interpret mechanical equipment performance and identify fault hypotheses and safe verification steps.
  4. Build an engineering model and assess its assumptions, limitations, and verification results.
  5. Prepare a project plan connecting scope, time, resources, and risks.

Learning areas

1. Electrical Systems, Control, and Operational Efficiency

  1. Read a training single-line or control diagram, identifying supply, loads, protection and measurement devices, and system boundaries.
  2. Analyze load, power quality, and efficiency requirements and fault indicators, checking data accuracy and conformity with equipment specifications.
  3. Identify the roles of protection, earthing, isolation, coordination, and control, referring settings and execution to specialists and approved technical references.
  4. Design an inspection and testing checklist covering criteria, tools, responsibilities, safety procedures, and permits without instructions for intervention on an energized circuit.
  5. Prepare a technical report comparing readings with approved limits and presenting possible causes, proposed actions, and approval requirements before execution. The application examines a case related to “Thermal Energy Engineering and Performance Analysis of Generators and Turbine Engines”.

2. Energy Management, Resource Efficiency, and Renewable Alternatives

  1. Inventory energy sources, loads, and significant uses, and establish measurement boundaries and a baseline that considers activity levels and operating conditions.
  2. Analyze consumption patterns, losses, and peak periods, checking meter and data quality before prioritizing improvement opportunities.
  3. Compare efficiency improvement and renewable energy alternatives according to technical suitability, resources, constraints, reliability, and total cost.
  4. Estimate expected savings and their scenarios, documenting assumptions and defining a measurement and verification method that isolates changes in operating conditions.
  5. Prepare an initiative implementation and monitoring plan covering responsibilities, technical approval, maintenance, energy indicators, and achieved results.

3. Mechanical Equipment Analysis and Fault Diagnosis

  1. Read training equipment data and diagrams, identifying function, operating conditions, design limits, and key measurement points.
  2. Analyze relationships between load, flow, pressure, temperature, and vibration, and review measurement quality before interpreting performance deviations.
  3. Identify failure modes involving components, seals, bearings, alignment, and lubrication, and connect fault symptoms to multiple testable hypotheses.
  4. Select inspections and diagnostic methods suited to the condition and criticality, and refer to manufacturer instructions and isolation and permit procedures before any intervention.
  5. Prepare a diagnostic report showing readings, evidence, possibilities, the next verification step, and the limits of conclusions from the available data.

4. Engineering Design, Modeling, and Simulation

  1. Translate needs into requirements, design limits, and load or operating cases, documenting criteria and references relevant to the case.
  2. Prepare an engineering model showing dimensions, materials, relationships, and constraints, and review consistency between drawings, assumptions, and inputs.
  3. Select a simulation method suited to the problem, define boundary conditions, and examine the sensitivity of results to input quality and model settings.
  4. Compare outputs with a reference calculation or available test data, distinguishing calculation accuracy from the validity of the model's representation of reality.
  5. Prepare a design report explaining results, limitations, risks, and required modifications, specifying matters requiring specialist engineering review and approval.

5. Project Planning and Implementation Control

  1. Define the project rationale, expected results, stakeholders, and success criteria, and document the scope of work and exclusions.
  2. Break deliverables into work packages and related activities, and estimate durations, resources, and activity dependencies.
  3. Prepare a schedule and cost baseline, identify delivery and review milestones, and clarify approval and escalation responsibilities.
  4. Analyze implementation risks, define responses and warning indicators, and control change requests and their effects on time and cost.
  5. Build a progress report covering variances, decisions, and lessons learned, and define procedures for accepting deliverables and closing the project.

Practical outputs

  1. A functional diagram, checklist, and preliminary analysis of electrical system performance.
  2. An energy baseline, opportunity list, and preliminary sensitivity study of alternatives.
  3. An equipment profile, fault diagnosis tree, and preliminary inspection plan.
  4. Design specifications, a simulation model, and a verification and review report.
  5. A project charter, implementation schedule, and change and risk tracking register.

Who should attend

  1. Engineers, technicians, supervisors and operations staff whose work relates to the programme subject.
  2. Managers and teams working in engineering, according to their practical responsibilities.
  3. Professionals responsible for applying the outputs of “Thermal Energy Engineering and Performance Analysis of Generators and Turbine Engines” within their organizations.

Prerequisites

  1. Working familiarity with the programme field and the ability to discuss a professional case or challenge.
  2. Confirm the suitability of your experience and any specialist prerequisites with the Union before participation.

Conclusion

The programme “Thermal Energy Engineering and Performance Analysis of Generators and Turbine Engines” brings together concepts, case review and a practical application. Participants prepare steps that can be adapted to their responsibilities and organizational resources, with an indicator to follow application and review results after returning to work.

Participation arrangements and any special requests are specified in the confirmation issued by the Union.

Request a new dateRequest a new programme dateArab Union for Human Resources Development
Programme

Thermal Energy Engineering and Performance Analysis of Generators and Turbine Engines

Previous dates — reference only: -

These dates have passed. This requests a new date, not a booking in the ended session. The Union confirms dates and availability.

7-15 digits; include the country code for international contact.

Applications are directed to the Union at: [email protected]

The Union reviews your application and contacts you to confirm availability, dates and arrangements. Submitting this form is not final confirmation of participation.

How we use your data

Submission is complete when a save confirmation and reference appear. The result explains the email notification status; saving a request or mail-server acceptance does not confirm inbox delivery. Submission does not confirm participation, pricing or a booking before the administration responds. The Union team will contact you to follow up on your request.

Other sessions of this programme